The chargers are only part of the bill. Here's how to budget the full installed project, when equipment financing is enough and when you need project financing, and how lenders look at utility timelines and usage.
Last updated
Equipment financing can pay for chargers, transformers and other identifiable equipment. Utility work, engineering, permits, trenching and installation often aren't covered, or are capped, so most charging projects are financed as a broader project: a term loan, an SBA loan or part of an acquisition or refinance. Lenders want the full installed budget, utility confirmation and conservative usage assumptions, and they usually rely on your existing business to carry the payment.
A few Level 2 or DC fast chargers alongside an existing fuel or wash business.
Talk it throughA larger transformer, switchgear or panels to support new equipment or future load.
Talk it throughDispensers, tank systems, POS, refrigeration, lighting or car wash equipment.
Talk it throughHigher-power charging and site work at a travel center or depot.
Talk it throughEvery layer below shows up in a real budget. Which layers a lender will finance depends on the structure.
Level 2 or DC fast chargers, pedestals, cable management, payment and network hardware, software subscriptions.
New or upsized transformer, switchgear, distribution panels, meters and the electrical service upgrade itself.
Service requests, load studies, utility design and any make-ready or line-extension charges the utility passes on.
Electrical and civil design, site plans, permit fees, inspections and commissioning.
Boring or trenching, conduit and wire, concrete pads, bollards, labor and restoration of paving.
Lighting, canopy, striping, accessible stalls, signage, and other upgrades done at the same time.
Equipment financing typically centers on the first two layers. Some lenders also cover part of the installation. Project financing can cover the full stack, subject to the lender's review of the budget. Coverage depends on the lender and structure.
| Topic | Equipment financing | Project financing |
|---|---|---|
| What it finances | Identifiable equipment: chargers, transformers, switchgear, dispensers, wash systems | The whole installed project: equipment plus design, utility, site work and soft costs |
| Collateral | The equipment itself, sometimes with a business guarantee | The business, real estate or a broader lien, depending on the structure |
| Installation and soft costs | Sometimes covered, often capped as a share of equipment cost; varies by lender | Usually included in the budget, subject to the lender's review |
| How funds flow | Usually paid to the vendor at delivery or installation | In draws as work is completed and inspected |
| Common forms | Equipment loan, finance lease, vendor financing | Term loan, SBA 7(a) or 504, construction or bridge loan, part of a larger acquisition or refinance |
The utility often sets the critical path. Lenders typically release funds as work is completed and verified, with the final payment after energization and inspection.
Confirm available capacity at the meter and what the utility will need to upgrade.
Submit the service request early. Utility timelines are often the longest part of the project.
Engineering, permit drawings, and equipment selection that matches the approved service.
Close on the structure that covers the budget you actually need, with a contingency.
Site work, conduit, pads and electrical work; funds released as work is verified.
Utility energizes the service, chargers are commissioned and inspected, final payment releases.
Highlighted steps are where financing funds are typically committed or released.
The utility, electrical contractor, equipment vendor, network provider and inspector all touch the schedule. Name one party to own it, and make sure bids clearly state what's excluded.
Use comparable sites, not best-case projections. Show the payment works if usage ramps slowly, and account for demand charges, network fees and maintenance.
There's no general requirement that existing gas stations, car washes or truck stops install EV charging. Some state and local building codes require EV-capable or EV-ready parking in certain new construction or major renovations. Check with your local building department.
The federal Section 30C charger credit doesn't apply to property placed in service after June 30, 2026. State, utility and local programs vary by location, budget and timing, and not every project qualifies. Confirm before you count on one, and plan financing that works without it.
Often fitsChargers, transformers, dispensers and other identifiable equipment.
LimitsShorter terms. Coverage of installation, utility charges and soft costs is limited or capped by many lenders.
Often fitsBuying a specific brand's chargers or equipment packages.
LimitsTied to that vendor's equipment; compare the full cost and terms with other options.
Often fitsProjects that mix equipment, site work and working capital, or upgrades rolled into an acquisition or refinance.
LimitsUnderwritten on the whole business's cash flow. SBA eligibility and terms depend on the borrower and use of proceeds.
Often fitsLarger projects tied to owner-occupied real estate and long-lived equipment.
LimitsFixed assets only; equipment needs at least a 10-year useful life. Better suited to bigger projects than a few chargers.
Often fitsLarger electrification projects with long utility timelines.
LimitsShort term and draw-based; needs a takeout or permanent loan.
Equipment, utility, design, site work and contingency, supported by bids. Equipment-only quotes understate the cost.
Whether capacity is confirmed, the expected timeline and who pays for upgrades on the utility side.
Sessions per charger per day and price per kWh, compared with similar sites. Lenders discount aggressive ramp-ups.
Electricity rates and demand charges, network fees, maintenance and warranty.
For most site owners, the station or wash, not the chargers, carries the loan in the early years.
Licensed electrical contractor, equipment warranties and who's responsible for uptime.
Get a full scope from an electrical contractor and the utility before you set the loan request.
Ask the utility what's available before ordering equipment. Upgrades on the utility side can add cost and months.
Base the case on comparable sites, and show the business can carry the payment if usage ramps slowly.
Treat rebates and credits as upside until they're confirmed for your project and timeline.
One party should own the schedule across utility, electrician, equipment vendor and inspector.
Sometimes. Equipment loans and leases focus on the equipment itself; some lenders cover a limited share of installation, and others cover none. Utility charges, engineering, permits and site work are more often financed through a term loan or broader project financing. Coverage depends on the lender and the structure.
Not as a general rule. Some state or local codes require EV-capable or EV-ready parking in certain new construction or major renovations, so check with your local building department. Adding chargers to an existing site is usually a business decision.
Not for property placed in service after June 30, 2026, when the federal Alternative Fuel Vehicle Refueling Property Credit (Section 30C) ended. State and utility programs vary by location and change often; confirm availability with the program and your tax advisor before relying on one.
Cautiously. Early utilization is hard to predict, so most lenders lean on the existing business's cash flow to support the payment and treat charging revenue as upside until there's history.
It depends on the utility. Some costs fall on the customer, some are covered under utility make-ready programs, and the split can depend on load and location. Ask the utility for a written cost estimate early.
Often, yes. Planned equipment or electrical upgrades can be included in an acquisition or refinance budget if the lender and program allow it. See the gas station, car wash and truck stop guides.
Send what you have. We'll talk through which structure could cover the full project.
Talk with Matt and Alex. You get a clear next step and someone to call when a question comes up.
Managing Director
Former Delta Bank executive who has closed more than 2,000 SBA loans over his career. He helps you weigh your options and present a request lenders can act on.
Client Lead
Your contact for documents, updates and follow-through as your financing moves ahead.
Share the site, the equipment and what you know about utility capacity. We'll talk through how to finance the full installed budget.
646-552-7701advisory@solairecapital.com